Project Documents - Software Methodology

Each student team is required to maintain a project notebook and a project Web site, each containing all project materials developed to date.

Documents for Every Project Phase

Teams are required to have:

These documents must be submitted with every project phase except for project selection, configuration control, software inspection, and acceptance test performance.

Phase-Specific Documents

The following are links to descriptions of each project deliverable, and templates that can be used as a starting point for project documents.

Project Selection Description Template
Reverse-engineered
software architecture
Description
Scenarios Description Template
Configuration control Description
Requirements Description Template Grading Guidelines
Time estimate & risk analysis Description Template Grading Guidelines
User manual Description Template Grading Guidelines
Design document Description Template Grading Guidelines
Acceptance test plan Description Template Grading Guidelines
Software inspection Description Forms Grading Guidelines
Acceptance Test Performance Description   Grading Guidelines
Final project notebook Description   Grading Guidelines

Last updated: 4/28/2002