Inspection Grading - Software Methodology

This assignment is worth 30 points (out of 500 total on the project). 10 points are based on your group performance, and 20 points are based on your individual performance.

The 30 points will be divided up as follows:

Category Points What kinds of things will I be looking for?
Group Performance 10
  • Does every member have a marked-up hardcopy of the code?
  • Did the TA receive a copy of the code and a list of role assignments at least 2 days before the inspection meeting?
  • Is the inspection meeting kept on track?
  • Is the material ready to be inspected?
  • Do you use the correct forms?
Individual Performance 20
  • Are you individually prepared for the meeting?
  • Are you on time for the meeting?
  • Do you contribute to the meeting?
  • Do you fulfill your inspection role in the meeting?
    • Does the moderator keep the meeting on track, and stop discussions that are not relevant to identifying defects?
    • Does the recorder accurately capture the issues?
    • Does the reader appropriately summarize the code?
    • Does the producer accept criticism of his/her work without getting defensive?